Call Us Today: 951-318-8542

3rd Street Storm Drain Project Stage 2 Lake Elsinore CA

The work to be completed includes the furnishing and installation of approximately 3,000 linear feet of storm drain. The storm drain types include Reinforced Concrete Pipe (RCP) and Reinforced Concrete Boxes (RCB) with various sizes and transitions. Both pre-cast and cast-in-place installations are identified in the plans. The work also includes the furnishing and installation of Manholes, Laterals, Catch Basins, Stub outs for Future Connections, Rip-Rap, and over 400 feet of Jack and Bore (installation method) 96 inch RCP under the Caltrans I-15 ROW as shown in the contract plans. Included in this Notice of Inviting Bids are Bid Schedule A and Bid Schedule B, Bid Schedule A shall correspond to the Plan set titled “Third Street Channel Stage 2” and Bid Schedule B shall correspond to the Plan set titled “Third Street Water Relocation”. The Contractor shall be responsible for completion of all other items not mentioned above, but indicated in the Plans and Specifications. 100 working days.

Download the PDF…